![]() On 15 October 1970, Orion's homeport changed to Charleston, South Carolina under the command of Submarine Squadron FOUR. History from the Dictionary of American Fighting Ships. Into 1970 she serviced the conventional and nuclear powered ships of that squadron from the Destroyer/Submarine Piers at Norfolk. Support of SubRon 6, however, has continued to be Orion's primary mission. Three years later she added foreign nuclear submarines to her long list of services performed after completing work on HMS Dreadnought. In June, her first nuclear submarine job came alongside in the form of Shark (SSN-591) at Norfolk. After that change of home port, Orion continued to service SubRon 6 at Norfolk and, during fleet exercises, in the Caribbean.Ī FRAM II overhaul and conversion to nuclear Sup-port, 6 September 1960-25 February 1961, was followed by refresher training off Cuba. Then, with SubRon 6, she steamed to Norfolk, her new home-port. Taking up duties with SubRon 6, 24 January 1946, she remained in the Canal Zone, with one interruption for overhaul, until. Assigned to the Atlantic Fleet, she operated off the east coast for four months, then sailed south to Balboa, C. As the formal surrender documents were being signed in Tokyo Bay, Orion was en route to the United States. At Saipan between 23 April and 1 September, she served as CTG 17.7 and as SOPA(Admin) for Tanapag Harbor in addition to her tender and repair activities which were performed for over 300 ships. The next day Orion headed back to Hawaii for overhaul. Arriving 26 August, she serviced 24 submarines, and 466 surface vessels, before being relieved, 9 December, by Griffin (AS-13). She remained in Western Australia until 6 August when she proceeded to Mios Woendi to establish Advanced Submarine Base Able. Conger for the correction!On 10 December she steamed for Australia, arriving at Fremantle 5 January 1944 to begin her mission of maintaining the material readiness of, and an adequate stock of supplies for, submarines operating in the southwest Pacific. Arriving there on the 29th, she received her first submarine, USS Gar (SS-206) alongside for repairs two days later. ![]() Isgrig in command.įollowing shakedown off southern California, Orion got underway for Pearl Harbor 23 November 1943. White and commissioned 30 September 1943, Capt. The second Orion (AS-18) was laid down 31 July 1941 at the Moore Dry Dock Co., Oakland, Calif. Isgrig, USNīe SURE and check out the latest NEWS on Orion - on the News Page. Beam 73' 4" Class Fulton Draft 25' 6" Commisioned 1943 Speed (rated) 15.4kts Decommissioned 1993 Compliment 1,487 Disposition ScrappedUSS ORION COMMANDING OFFICERSRank And Nameĝates Capt. (tons) 9,250 Built / Launched / Length 529' 6" Built By Moore Shipbuilding and Dry Dock Co., ![]() USS Orion AS 18 United States Navy Submarine Tenders USS Orion AS 18 USS Orion AS 18Ĭarrying the "Don't Tread On Me" flag proudly.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |